Follow Exercise 2. a, b, c and d directions and use Microsoft Visio to draw an AOA network diagra ...
Follow Exercise 2. a, b, c and d directions and use Microsoft Visio to draw an AOA network diagram representing the project. 2. Consider Table 6-2. All duration estimates or estimated times are in days, and the network proceeds from Node 1 to Node 9 . (Note that you can easily change this table to create multiple exercises.) Table 6-2 Notwerk dianram data for a cmall nroiort
a. Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated time. b. Identify all of the paths on the network diagram and note how long they are, using Figure 6-8 as a guide for how to represent each path. c. What is the critical path for this project and how long is it? d. What is the shortest possible time needed to complete this project? Note: Assume all durations are in days. Path 1: A-D-H-J Length \( =1+4+6+3=14 \) days Path 2: \( \quad \mathrm{B}-\mathrm{E}-\mathrm{H}-\mathrm{J} \quad \) Length \( =2+5+6+3=16 \) days \( \begin{array}{lll}\text { Path 3: } & \text { B-F-J } & \text { Length }=2+4+3=9 \text { days } \\ \text { Path 4: } & \text { C-G-I-J } & \text { Length }=3+6+2+3=14 \text { days }\end{array} \) Since the critical path is the longest path through the network diagram, Path 2, B-E-H-J, is the critical path for Project X. Determining the critical path for project \( \mathrm{X} \) Need help with the AOA network diagram, which I believe have to be done in Visio. But a drawn out would also be fine and I can visualize it. Also, in answering parts c and \( d \). Thank you sincerely!