Case Study 1: Work Breakdown Structure Consider a team is working on a traditional project. The project duration is expected to be 3 months ( 12 weeks). The team requires to complete the work as soon as possible, and any team members can be available for this project any time. The team includes: Alex (requirements engineer, UI designer), Sandra (system architect, developer), Kevin (developer, QA expert), Anna (QA expert), Julia (QA expert). A draft WBS was created, see below (the milestones are highlighted with ), but some elements are missing or incorrect there: Your task is to identify 5 incorrect elements and briefly justify what should be corrected and explain how exactly it should be corrected. No justification or nor explanation how exactly it should be corrected points. Note that there might be more than 5 potential issues in this draft - you need to list only 5 . If more than 5 items are listed, only the first 5 will be marked.


We have an Answer from Expert

View Expert Answer

Expert Answer





A Work Breakdown Structure (WBS) is a hierarchical decomposition of the work needed to complete a project. It is commonly used in project management to organize and define the scope of work. In the context of system design and system architecture, a WBS helps break down the tasks and activities required to design and develop a system. This is a high-level example, and the actual WBS will vary depending on the specific system being designed and the project requirements. The WBS provides a structured breakdown of tasks and deliverables, helping with project planning, resource allocation, and tracking progress throughout the system design and architecture phases
We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe