A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles arc. Assuming an allowance factor of 8 percent of job time, compute the standard time for this job. (Round your answers to 3 de

A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. c. Assuming an allowance factor of 8 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.)


We have an Answer from Expert

View Expert Answer

Expert Answer


Element Performance Rating(P) 1 2 3 4 5 6 Total(1 to 6) Average(Tot