(Solved):
A \( 1.0 m \) by \( 1.0 m \) box culvert is placed on a steep slope. The upstream head is \( 1.3 m ...
A \( 1.0 m \) by \( 1.0 m \) box culvert is placed on a steep slope. The upstream head is \( 1.3 m \) with an unsubmerged entrance. Neglect entrance losses and Determine: - The discharge through the culvert. - The critical depth at the entrance.