Home / Expert Answers / Civil Engineering / 6-it-is-proposed-to-construct-a-facultative-pond-treating-600-mathrm-m-3-mathrm-d-w-pa128

(Solved): 6. It is proposed to construct a facultative pond treating \( 600 \mathrm{~m}^{3} / \mathrm{d} \) w ...





6. It is proposed to construct a facultative pond treating \( 600 \mathrm{~m}^{3} / \mathrm{d} \) wastewater with a \( B O D
6. It is proposed to construct a facultative pond treating \( 600 \mathrm{~m}^{3} / \mathrm{d} \) wastewater with a \( B O D \) of \( 300 \mathrm{mg} / \mathrm{L} \) to \( 50 \mathrm{mg} / \mathrm{L} \). The reaction constant \( \mathrm{k} \) at \( 20^{\circ} \mathrm{C}=0.30 \mathrm{~d}^{-1} \). Compute the required surface area of the facultative pond and the effluent BOD if the temperature of the coldest month is \( 13^{\circ} \mathrm{C} . \mathrm{kT}_{T}=\mathrm{k}_{20}(1.05)^{(\mathrm{t}-20)} \). Design the facultative pond and check if it meets the surface loading, \( \lambda_{\mathrm{s}}=L, Q / A=60(1.099)^{\mathrm{T}} \) in \( \mathrm{Kg} / \mathrm{ha} / \mathrm{d} \) ( 8 marks)


We have an Answer from Expert

View Expert Answer

Expert Answer


I have solved this problem in detail
We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe